House Extension Cost in Edinburgh: A Local Guide

Wondering about house extension cost in Edinburgh? Here is what affects the price, based on our own projects. The honest answer is that it depends on more than size. Two extensions of the same floor area can differ in price by tens of thousands of pounds because of the ground, the drainage, the roof, the opening into the house and the finish. This guide explains where the money goes, so you can plan a realistic budget before you talk to an architect.

40+ yrs · Edinburgh & Lothians
01House Extension Cost in Edinburgh

Wondering about house extension cost in Edinburgh? Here is what affects the price, based on our own projects. The honest answer is that it depends on more than size. Two extensions of the same floor area can differ in price by tens of thousands of pounds because of the ground, the drainage, the roof, the opening into the house and the finish. This guide explains where the money goes, so you can plan a realistic budget before you talk to an architect.

Single-storey extension under construction in Edinburgh
On site · Old Town
02House Extension Cost in Edinburgh

What affects house extension cost in Edinburgh

These are the factors that make the biggest difference on extensions we price in Edinburgh, Midlothian and East Lothian.

1. Size and number of storeys

Floor area drives most of the cost, but a two-storey extension is rarely double the price of a single-storey one. The foundations, roof and groundworks are shared, so the cost per square metre often comes down as you add a second floor.

2. The ground and the foundations

Good, firm ground means standard strip foundations at a normal depth. Clay near trees, made-up ground, old coal workings in parts of Midlothian and East Lothian, or soft ground near rivers and the coast can mean deeper or engineered foundations. This is one of the biggest unknowns, which is why engineers often ask for trial pits before designing the foundations.

3. Drainage

If a drain runs under where the extension will go, it may need diverting, and a new kitchen or bathroom needs new connections. On older Edinburgh properties, it is common to find the existing drains need repair once they are exposed. See drainage.

4. Access

If machines and materials can get straight to the back of the house, the job is quicker. If everything has to come through a narrow side passage, it takes longer, although our 750mm narrow-access diggers and dumpers make a big difference.

5. The opening into the house

A wide, open-plan connection into the existing kitchen usually means removing part of a load-bearing wall and fitting a steel beam. Bigger openings need bigger steels, more temporary support and sometimes new foundations under the steel. See load-bearing wall removal.

6. Roof type and glazing

A flat roof is usually the most economical. Pitched roofs, roof lanterns, large rooflights and wide bi-fold or sliding doors all add cost, but they also make a big difference to how the room feels.

7. The finish

Kitchens, flooring, heating, lighting and bathrooms can account for a large share of the budget. Decide early what is in your builder's price and what you are buying separately.

Single-storey extension under construction in Edinburgh
On site · Old Town
03Old Town Building Services

Typical price ranges

Every job is priced individually from drawings, but these ranges from our recent projects give you a starting point.

Type of jobTypical price range from our recent work
Small single-storey rear extension(price on request)
Single-storey kitchen and family-room extension(price on request)
Two-storey extension(price on request)
Extension combined with garage conversion(price on request)
04House Extension Cost in Edinburgh

Other costs to budget for

  • Architect or designer fees for drawings and the building warrant application.
  • Structural engineer fees for calculations on foundations, steels and roof.
  • Building warrant fees, set by the council and based on the value of the work.
  • Planning fees, if planning permission is needed.
  • Coal mining risk assessment, in some parts of Midlothian and East Lothian.
  • A contingency of around 10% for things nobody can see until the ground is opened.
Single-storey extension under construction in Edinburgh
On site · Old Town
05House Extension Cost in Edinburgh

How to keep the cost under control

  • Get proper drawings before asking for prices, so every builder quotes for the same thing.
  • Ask for a breakdown, not a single figure. You can see where the money goes and what can change.
  • Find out early about the ground. Trial pits are cheap compared to redesigning foundations mid-build.
  • Decide what is included. Kitchens, flooring and decoration are often where budgets drift.
  • Keep changes to a minimum once work has started.
Single-storey extension under construction in Edinburgh
On site · Old Town
06Old Town Building Services

Do you need planning permission?

In Scotland, some single-storey extensions are permitted development and do not need planning permission, but size, height, position and conservation areas all change that. Almost every extension needs a building warrant. Your architect will check both. Read more in our guide to building warrants in Edinburgh.

07House Extension Cost in Edinburgh

Get a price for your extension

If you have drawings, send them over and we will price them in detail. If you are just starting out, we can visit, look at the ground and access, and give you an idea of what to budget for before you commit to design fees. See our house extensions page for more on how we work.

Single-storey extension under construction in Edinburgh
On site · Old Town
08Questions

Frequently asked

Get a free, no-obligation quote

Tell us what you need and where you are. Call 07881 680990 or send us a few details and photos, and we'll come back to you quickly.

Is it cheaper to extend or move?

Often it is cheaper to extend once you add up stamp duty (LBTT in Scotland), solicitor and estate agent fees and moving costs, but it depends on the extension and the house. A rough price for the extension helps you compare.

How long does it take to get a building warrant?

It varies by council and how complete the application is. Allow several weeks to a few months, and apply well before you want to start.

Can I get a fixed price for an extension?

We give a detailed written quote from the drawings. Anything that cannot be known until the ground is opened, such as poor ground or a hidden drain, is explained up front and agreed before we go ahead.

Call nowFree quote